Project details

PPI was engaged by an international oil and gas operator, to improve quality assurance issues for its offshore development.

To eliminate costly non-productive rig and standby time, PPI personnel verified that purchased or rental equipment met specified requirements before equipment was mobilised to the well-site.

Analysed data also allowed the operator to significantly reduce standby time, resulting in substantial cost savings for the vendor and operator.